Suppose you own an existing water powered mill complex whose hydromechanical facilities have not been operational for decades.  You would like to develop a hydropower project at the site, using the existing dam, headrace, and headgates, plus new equipment including two small generators, penstocks, and appurtenant facilities, to provide electricity to your home and workshop.  Do you need a license from the Federal Energy Regulatory Commission?

In the case of the Egnaczak Net Zero Hydro Project proposed for the outlet of the Hoosic River in Cheshire, Massachusetts, the FERC concluded that section 23(b)(1) of the Federal Power Act requires that project's owners to obtain a license for the project's construction, maintenance, and operation.  Proposed by Kenneth and Susan Egnaczak, the Egnaczak Net Zero Hydro Project would have a total generating capacity of 10.7 kilowatts.

Pursuant to section 23(b)(1) of the Federal Power Act, a non-federal hydroelectric project must be licensed (unless it has a still-valid pre-1920 federal permit) if it:
(a) is located on a navigable water of the United States;
(b) occupies lands or reservations of the United States;
(c) utilizes surplus water or waterpower from a government dam; or
(d) is located on a stream over which Congress has Commerce Clause jurisdiction, is constructed or modified on or after August 26, 1935, and affects the interests of interstate or foreign commerce.
The fourth prong itself has three main elements: project located on a Commerce Clause stream, post-1935 construction or modification, affecting interstate commerce.  In this case, FERC concluded that the Egnaczak project satisfied the fourth prong.

First, FERC found that the Egnaczak project is located on a Commerce Clause stream.  Under a 1965 Supreme Court ruling, for purposes of Federal Power Act section 23(b)(1), Commerce Clause streams are the headwaters and tributaries of navigable waters of the United States.  While FERC declined to determine whether the Hoosic River is navigable at the site of the project, it concluded that downstream segments of the Hoosic are navigable, as is the Hudson River into which the Hoosic flows.

Second, FERC next found that installing new hydroelectric generating capacity constitutes post-1935 construction within the meaning of Federal Power Act section 23(b)(1). 

Third, FERC found that the project would offset both electrical and heating needs that would have been otherwise supplied by the interstate grid -- and thus that the project would affect the interests of interstate commerce.  A footnote notes, "It is well settled that small hydroelectric projects that are connected to the interstate grid affect interstate commerce by displacing power from the grid, and the cumulative effect of the national class of these small projects is significant for purposes of FPA section 23(b)(1)."

FERC concluded that because the project would be located on a Commerce Clause stream, would be constructed after 1935, and would affect interstate commerce through its connection to the interstate grid, Section 23(b)(1) of the Federal Power Act requires Kenneth and Susan Egnaczak to obtain a license for the project's construction, maintenance, and operation.  The FERC order also suggests the project may be eligible to obtain an exemption from licensing as a small hydroelectric power project of 10 megawatts or less, and encourages the applicants to investigate the requirements for securing an exemption from licensure.

Texas small hydro project loses exemption

Wednesday, March 25, 2015

What happens to a proposed hydroelectric project takes longer than anticipated to be built, due to difficulties with project financing and severe flooding?  As the developer of a proposed project in Texas recently found out, federal regulators can be lenient up to a point -- but under some circumstances the developer can lose its federal authorization to develop and operate the project.

The A.H. Smith Dam on the San Marcos River in Martindale, Texas was originally constructed in about 1894 to provide mechanical power a cotton gin; later, electric generation was installed, but power production ceased in the 1940s when low wholesale energy prices made operation uneconomic.  Modern hydropower facilities rated at 150 kilowatts were installed in 1984, but were ultimately abandoned.

In 2005, developer Hydraco Power, Inc. applied to the Federal Energy Regulatory Commission for an exemption from the licensing requirements of Part I of the Federal Power Act for its proposed A.H. Smith Dam Project.  Hydraco's project included refurbishing and restoring the operation of the existing turbine located at the dam's powerhouse, installing a new buried transmission line and a water surface elevation gate in the headpond.

On June 2, 2006, the Commission granted Hydraco an exemption for the project.  As a standard condition of exemptions, the Commission retained the right to revoke the exemption if any term or condition was violated.  Among the terms was a requirement that Hydraco file within 120 days a
plan and schedule to install the new transmission line and restore the powerhouse, turbine, and trash racks to operating condition, as well as notice that the Commission could terminate the exemption if actual construction of any proposed or required facility had not begun within two years or had not been completed within four years of the date of issuance of the exemption.

Over the next 8 years, Hydraco filed a series of construction plans and schedules, but never completed the project despite obtaining repeated extensions of key deadlines.  After multiple prompts by Commission staff to file a revised plan and schedule for restoring project operation or an application to surrender the exemption, the Commission noted that Hydraco either failed to respond or responded by stating that it could not estimate a schedule for restoring project operation because project construction, including major component repairs, was on hold due to lack of funds.

After the Commission issued a public notice in August 2014 stating its intent to terminate the project exemption "due to Hydraco’s longstanding violation of exemption Article 10 and its failure to provide a timeframe for restoring project generation", on November 20, 2014, the Commission issued an Order Terminating Exemption. That order found that "Hydraco has only performed minimal work at the project since obtaining its exemption in 2006 and that it lacks the funding to proceed with the necessary component repairs, including construction of the powerhouse interior and generating unit."

Hydraco filed a request for rehearing of the Order Terminating Exemption.  On rehearing, Hydraco asserted that it had reached a financing agreement with a new investor and, consequently, it is ready to perform the work needed to comply with its exemption. Hydraco also objected to the findings that project construction was at a standstill and that Hydraco intended to abandon the project, noting that the Commission should excuse construction delays caused by severe flooding.

Last week, the Commission issued an Order Denying Rehearing in the case.  It first noted that Hydraco had not demonstrated that it now has the money needed to bring the project on line.  Not only did Hydraco not show evidence of a final financing agreement, but the documents showed a source of only half of the funding needed for project restoration.  Second, the Commission noted that Hydraco's recent activities -- regularly inspecting the dam and removing debris from its spillway, trashracks, and grates, securing the site against vandalism and installing lighting, and repairing damage caused by a flood -- are "either maintenance or repair, not project development."  Finally, the Commission articulated its "doctrine of implied surrender", which it applies where the entity responsible for the project has, by action or inaction, clearly indicated its intent to abandon the project, but has not filed a surrender application.

With the exemption terminated and Hydraco's request for rehearing denied, the A.H. Smith Dam project faces an uncertain future.  On the one hand, the site presumably still offers many of the same values that Hydraco hoped to capture -- use an existing dam, with existing generation facilities, to generate renewable electricity.  However, the loss of the FERC exemption means that Hydraco (or any other developer) will have to start the federal hydropower process over if it hopes to redevelop the dam as a hydroelectric generating site.

The case of the A.H. Smith Dam project illustrates a number of themes: interest in restoring existing hydropower infrastructure to generate renewable energy with relatively less environmental impact than newly-built dams, the challenge of securing financing for small hydropower projects -- and perhaps most importantly the value of compliance with FERC hydropower rules.

September 9, 2010 - Lightship Nantucket; FERC signs Colorado MOU on small hydro

Thursday, September 9, 2010

The Lightship Nantucket WLV61, in port on Martha's Vineyard in summer 2010.  Until 1983, lightships such as this were used to mark shoals; they have since been functionally replaced (if not aesthetically so) by automated buoys.
The Federal Energy Regulatory Commission (FERC) is working with states to promote the development (or redevelopment) of small hydropower projects across the country.  FERC has recently signed Memoranda of Understanding (MOUs) with four states on the development of hydrokinetic projects: California, Washington, Maine, and Oregon.  Now FERC has signed an MOU with Colorado to streamline the procedures for developing small-scale hydropower projects in Colorado.  According to a recent federal survey, Colorado could be host to several hundred potential small (5 MW or smaller) hydropower projects.  Altogether, these small projects could add up to a combined capacity of more than 1,400 MW.

The MOU focuses on the development by Colorado of a pilot program to test procedural options for simplifying the processes for developers to obtain conduit exemptions and small (5MW or less) project exemptions.

The MOU opens the door for developers of small projects in Colorado to participate in the pilot program.  Colorado and FERC are both expected to take input from project developers about the kind of obstacles they face in permitting and exempting small projects - and about what can be done to help more projects be developed.

As we've seen in Maine, developing or redeveloping small hydro projects can run into siting and permitting challenges at the federal, state, and local levels.  For example, the Scribner's Mill dam reconstruction and repowering project on the Crooked River in Maine faces opposition on water quality, environmental and fisheries concerns.  While an MOU like that between FERC and Colorado might not eliminate these challenges, stakeholders are hopeful that a resolution will be reached that allows environmentally responsible projects to move forward.

August 27, 2010 - restoring old dams? sunken treasure

Friday, August 27, 2010

Storm over the Kennebec River near Dresden

Earlier this month, I wrote about the situation at Scribner's Mill on the Crooked River in Maine.  The Scribner's Mill Preservation Project is doing a great job of restoring the old sawmill located on the banks of the river.  Formerly, the sawmill was paired with a nine-foot dam that was breached in 1972; prior to dam breach, the impounded water fell through water wheels to power the mill directly.  The mill preservationists are again proposing to build a dam on the site to allow the mill to regain its status as a working water mill.  Two years ago, they proposed putting up a 4' dam; the Maine Department of Environmental Protection rejected their efforts.  Now they're proposing a 3' dam.

Arguments against rebuilding the dam include ones based on the importance of the Crooked River to the entire Sebago Lake ecosystem.  The Crooked River is the principal spawning habitat for the famous wild landlocked salmon in the lake.  Landlocks are the same species as Atlantic salmon, but spend their entire lives in fresh water.  Maine has a special fishery for wild landlocked salmon, and Sebago Lake is one of its most accessible waterbodies.  In addition to fisheries concerns, the Crooked River is also the principal surface inflow of water into the lake, which is the drinking source for about 200,000 people in Maine.

Last night, Maine Public Broadcasting Network ran a good story on the debate.

In other renewable news: following on the recent ORPC tidal energy turbine installation at a Coast Guard facility in Eastport, today the Coast Guard is raising a wind turbine at a Southwest Harbor facility.


Who doesn't love a tale of a forgotten shipwreck holding a sunken treasure?  During a blizzard in February 1944, the British freighter Empire Knight foundered on a covered reef near Boon Island off York, Maine.  The ship broke up and sank.  In 1990, the Coast Guard learned that the ship contained over 17,000 pounds of mercury.  Divers recovered a small portion of the mercury and contaminated material, but found that 16,000 pounds had escaped and was loose in a cargo hold.  The Coast Guard closed the site.  Now, a treasure hunter wants to recover the mercury in an environmentally responsible manner -- and also what he believes may be copper-platinum wire worth $200 million (a bit more valuable than the copper wire commonly stolen!), plus a "secret cargo" that could be worth from $10 million on up.