Restoring old mill hydro sites and FERC licensure

Friday, February 5, 2016

Suppose you own an existing water powered mill complex whose hydromechanical facilities have not been operational for decades.  You would like to develop a hydropower project at the site, using the existing dam, headrace, and headgates, plus new equipment including two small generators, penstocks, and appurtenant facilities, to provide electricity to your home and workshop.  Do you need a license from the Federal Energy Regulatory Commission?

In the case of the Egnaczak Net Zero Hydro Project proposed for the outlet of the Hoosic River in Cheshire, Massachusetts, the FERC concluded that section 23(b)(1) of the Federal Power Act requires that project's owners to obtain a license for the project's construction, maintenance, and operation.  Proposed by Kenneth and Susan Egnaczak, the Egnaczak Net Zero Hydro Project would have a total generating capacity of 10.7 kilowatts.

Pursuant to section 23(b)(1) of the Federal Power Act, a non-federal hydroelectric project must be licensed (unless it has a still-valid pre-1920 federal permit) if it:
(a) is located on a navigable water of the United States;
(b) occupies lands or reservations of the United States;
(c) utilizes surplus water or waterpower from a government dam; or
(d) is located on a stream over which Congress has Commerce Clause jurisdiction, is constructed or modified on or after August 26, 1935, and affects the interests of interstate or foreign commerce.
The fourth prong itself has three main elements: project located on a Commerce Clause stream, post-1935 construction or modification, affecting interstate commerce.  In this case, FERC concluded that the Egnaczak project satisfied the fourth prong.

First, FERC found that the Egnaczak project is located on a Commerce Clause stream.  Under a 1965 Supreme Court ruling, for purposes of Federal Power Act section 23(b)(1), Commerce Clause streams are the headwaters and tributaries of navigable waters of the United States.  While FERC declined to determine whether the Hoosic River is navigable at the site of the project, it concluded that downstream segments of the Hoosic are navigable, as is the Hudson River into which the Hoosic flows.

Second, FERC next found that installing new hydroelectric generating capacity constitutes post-1935 construction within the meaning of Federal Power Act section 23(b)(1). 

Third, FERC found that the project would offset both electrical and heating needs that would have been otherwise supplied by the interstate grid -- and thus that the project would affect the interests of interstate commerce.  A footnote notes, "It is well settled that small hydroelectric projects that are connected to the interstate grid affect interstate commerce by displacing power from the grid, and the cumulative effect of the national class of these small projects is significant for purposes of FPA section 23(b)(1)."

FERC concluded that because the project would be located on a Commerce Clause stream, would be constructed after 1935, and would affect interstate commerce through its connection to the interstate grid, Section 23(b)(1) of the Federal Power Act requires Kenneth and Susan Egnaczak to obtain a license for the project's construction, maintenance, and operation.  The FERC order also suggests the project may be eligible to obtain an exemption from licensing as a small hydroelectric power project of 10 megawatts or less, and encourages the applicants to investigate the requirements for securing an exemption from licensure.

Fish passage for hydrokinetic projects?

Thursday, May 17, 2012

Fishways are often found at dams to allow fish to pass upstream or downstream - but what does fish passage mean for dam-less hydrokinetic projects?

Hydrokinetic energy projects are an innovative way to produce electricity from moving water without building dams.  Companies are developing a variety of technologies, many of which use water flowing in a river, ocean or tidal current to spin turbine-generator sets.  Most grid-connected hydrokinetic projects are regulated by the Federal Energy Regulatory Commission under its authority over hydropower.  This authority comes largely from the Federal Power Act, which requires the Commission to include certain terms in the hydropower project licenses it issues and gives it discretion to impose other conditions.  For example, Section 18 of the Federal Power Act provides that the Commission shall require the construction, maintenance, and operation by a licensee of such fishways as may be prescribed by the Secretary of the Interior or the Secretary of Commerce.

Hydrokinetic technologies are still fairly new, so only a handful of projects have received FERC licenses so far.  Given that hydrokinetic projects do not include the construction of a new dam, one might not expect fish passage to be an issue, particularly at tidal or ocean sites.  Indeed, it appears that for at least some hydrokinetic projects, fish passage may not be an issue.  For example, when FERC issued a pilot project license to Verdant Power, LLC for its Roosevelt Island Tidal Energy Project in New York City's East River, the Commission did not include a reservation of the right to require a fishway in the license.

The Commission did include such a fishway reservation in the pilot license it granted to Ocean Renewable Power Company's Cobscook Bay Tidal project in Maine waters.  In that case, the Secretary of the Interior cited important and highly valued populations of resident and migratory fish, including endangered Atlantic salmon.  Although the Secretary did not prescribe a fishway at the time, Interior requested that the Commission reserve its authority to prescribe fishways under Section 18.  When FERC granted ORPC's license, it included an article reserving the authority to require the licensee to construct, operate, and maintain, or to provide for the construction, operation, and maintenance of such fishways as may be prescribed by the Secretary of the Interior.

Although the project licensee later requested an exemption from this article because its project is not a dam and will not create any impoundment, the Commission declined to amend the license.  Explaining its reasoning, the Commission pointed to the policy it developed from its traditional hydropower licensing: if the Secretary of the Interior or Commerce so requests, the Commission will include an article reserving the Commission’s authority to require the construction and operation of fishways to preserve the requesting Secretary's future right to to prescribe fishways under Section 18.

What a possible fishway system for a tidal hydrokinetic project remains to be seen, as does whether FERC will impose such a requirement on any operating projects.  If the Secretary of the Interior or Commerce prescribes a fishway, FERC can assert its jurisdiction under Section 18 to require fishway installation.  Factors that could lead to such a decision may include the particular fish species and resources at each project's site, and a project's actual impacts on those fish.