Staff of the U.S. Federal Energy Regulatory Commission have recommended against licensing a dam, reservoir, and hydropower project proposed for the Bear River near Preston, Idaho.
The case involves a 2013 application by Twin Lakes Canal Company to the FERC for a license to construct, operate, and maintain the Bear River Narrows Project. The project would be located on the main stem of the Bear River in Franklin County, Idaho, about 9 miles northeast of the city of Preston. It would feature a 109-foot-high dam impounding a 362-acre reservoir, and a powerhouse with an installed capacity of 10 megawatts and estimated average annual generation of of 48,531 megawatt-hours of electricity. The reservoir would also be used to provide up to 5,000 acre-feet of water to Twin Lakes’ irrigation system during dry years.
Under the Federal Power Act, the FERC is charged with processing licenses for most hydropower projects in the U.S. Federal law guides the FERC in this duty. Sections 4(e) and 10(a)(1) of that act require the Commission to give
equal consideration to the power development purposes and to the
purposes of energy conservation; the protection of, mitigation of damage
to, and enhancement of fish and wildlife; the protection of
recreational opportunities; and the preservation of other aspects of
environmental quality. The Commission can only issue licenses that in its judgment are best adapted to a comprehensive plan for
improving or developing a waterway or waterways for all beneficial public uses. Additionally, the National Environmental Policy Act of 1969 requires the agency to analyze and document the environmental effects of proposed federal actions such as granting Twin Lakes' application.
Commission staff released its final environmental impact statement on Twin Lakes' license application on April 27, 2016. That document, called an EIS, analyzes the effects of proposed project construction and operation, and recommends conditions for any license that may be issued for the project.
In the Bear River Narrows Project EIS, FERC staff considered Twin Lakes’ proposal for licensing, as well as three alternatives: (1) no-action (i.e. not licensing the project, so it can't be constructed); (2) the applicant’s proposal with staff modifications (staff licensing alternative); and (3) the staff licensing alternative with an additional condition requested by the Bureau of Land Management.
The EIS notes the existence of four Commission-licensed hydroelectric facilities located on the Bear River
in Idaho with a combined installed capacity of more than 78 MW, including the Oneida development directly upstream. It
also notes uses of the "Oneida Narrows" section of the Bear River that
would be flooded by the Bear River Narrows Project impoundment, including a recreational
trout fishery and boating opportunities, and habitat for sensitive
wildlife species.
Based on a review of the anticipated environmental and economic effects of the proposed project and its alternatives, as well as the agency and public comments filed on this project, staff recommends no action (license denial) as the preferred alternative. In staff's words, "The overall, unavoidable adverse environmental effects of both action alternatives would outweigh the power and water storage benefits of the project."
For these reasons, FERC staff concluded that "any license issued for the proposed project could not be best adapted to a comprehensive plan for improving or developing the Bear River for all of its beneficial public uses, especially its substantial public recreation use at the proposed project site. We, therefore, recommend license denial."
Twin Lakes Canal Company's application to the Commission for a license to construct the project remains pending.
Showing posts with label fish. Show all posts
Showing posts with label fish. Show all posts
FERC staff recommends against Bear River dam
Wednesday, April 27, 2016
Labels:
Bear River,
boating,
canal,
EIS,
FERC,
fish,
habitat,
Idaho,
irrigation,
license,
navigation,
NEPA,
trout,
Twin Lakes,
water,
wildlife
West Branch storage project relicensed
Wednesday, March 30, 2016
Earlier this month U.S. hydropower regulators issued a new license for the West Branch Project, which includes water storage facilities on the West Branch of the St. Croix River in Maine.
The Federal Energy Regulatory Commission first issued an original license for the West Branch Project on September 4, 1980. The project includes two developments, Sysladobsis and West Grand, that operate as water storage facilities to provide flood storage and flow releases for downstream hydroelectric generation. The Sysladobsis Development uses Sysladobsis Lake as its impoundment. The license describes the West Grand Development as composed of several natural lakes including Scraggly Lake, Keg Lake, Bottle Lake, Junior Lake, Junior Bay, Norway Lake, Pug Lake, Pocumcus Lake, Horseshoe Lake, and West Grand Lake.
Dikes and dams are used to control and release water, first from Sysladobsis Lake into the downstream West Grand impoundment, then into either Grand Lake Stream or Grand Lake Brook. Many of the dams and dikes at these sites are old -- the Sysladobsis dam, West Grand dam, and Farm Cove dike were constructed in 1861, 1836, and 1879, respectively, although all three have since been rebuilt.
Each of these developments operates in a seasonal store-and-release mode whereby water is stored to reduce downstream flooding during periods of high flow and released during periods of low flow to augment generation at the downstream hydroelectric projects.
The West Branch Project also operates as part of the larger St. Croix River headwater storage system. This network of dams includes Woodland Pulp LLC’s Forest City Project No. 2660 and the recently relicensed Vanceboro Project No. 2492. Generation associated with these projects occurs at the Grand Falls and Woodland hydroelectric projects downstream on the St. Croix River.
The West Branch Project's original 1980 license was amended in 1987 to include the existing Farm Cove dike, but the original license expired on September 30, 2000. Since then, the licensee has operated the project under an annual license pending the disposition of a new license application.
On March 19, 2009, the licensee filed, pursuant to sections 4(e) and 15 of the Federal Power Act (FPA), an application for a new license to continue operating and maintaining the West Branch Project. The licensee proposed to continue store-and-release operation with some changes, continue operating fishways and take other measures to promote fish populations, enhance a land use plan, and develop a historic properties management plan.
Fishery issues have been contentious in the St. Croix River system. After opportunity for public comment, agency consultation, and preparation of an Environmental Assessment, the Maine Department of Inland Fisheries and Wildlife asked the Commission to delay its licensing decision until fishery management talks concluded. After being notified by the Department that those talks had concluded, on March 15, 2016 the Commission issued Woodland Pulp a new license to continue operating and maintaining the West Branch Project.
The new license requires a number of measures to protect and enhance water quality, aquatic habitat, fisheries resources, terrestrial resources, and recreation opportunities at the project. These include a requirement to operate the developments in store-and-release mode between defined pond elevations, to provide certain minimum flows of water, to develop an Operation Compliance Monitoring Plan, and to provide and enhance fish passage.
A list maintained by the Federal Energy Regulatory Commission shows over 1,000 active hydropower licenses. Many of these licenses will expire in the near future, so relicensing activity for FERC-licensed hydroelectric projects is expected to increase.
The Federal Energy Regulatory Commission first issued an original license for the West Branch Project on September 4, 1980. The project includes two developments, Sysladobsis and West Grand, that operate as water storage facilities to provide flood storage and flow releases for downstream hydroelectric generation. The Sysladobsis Development uses Sysladobsis Lake as its impoundment. The license describes the West Grand Development as composed of several natural lakes including Scraggly Lake, Keg Lake, Bottle Lake, Junior Lake, Junior Bay, Norway Lake, Pug Lake, Pocumcus Lake, Horseshoe Lake, and West Grand Lake.
Dikes and dams are used to control and release water, first from Sysladobsis Lake into the downstream West Grand impoundment, then into either Grand Lake Stream or Grand Lake Brook. Many of the dams and dikes at these sites are old -- the Sysladobsis dam, West Grand dam, and Farm Cove dike were constructed in 1861, 1836, and 1879, respectively, although all three have since been rebuilt.
Each of these developments operates in a seasonal store-and-release mode whereby water is stored to reduce downstream flooding during periods of high flow and released during periods of low flow to augment generation at the downstream hydroelectric projects.
The West Branch Project also operates as part of the larger St. Croix River headwater storage system. This network of dams includes Woodland Pulp LLC’s Forest City Project No. 2660 and the recently relicensed Vanceboro Project No. 2492. Generation associated with these projects occurs at the Grand Falls and Woodland hydroelectric projects downstream on the St. Croix River.
The West Branch Project's original 1980 license was amended in 1987 to include the existing Farm Cove dike, but the original license expired on September 30, 2000. Since then, the licensee has operated the project under an annual license pending the disposition of a new license application.
On March 19, 2009, the licensee filed, pursuant to sections 4(e) and 15 of the Federal Power Act (FPA), an application for a new license to continue operating and maintaining the West Branch Project. The licensee proposed to continue store-and-release operation with some changes, continue operating fishways and take other measures to promote fish populations, enhance a land use plan, and develop a historic properties management plan.
Fishery issues have been contentious in the St. Croix River system. After opportunity for public comment, agency consultation, and preparation of an Environmental Assessment, the Maine Department of Inland Fisheries and Wildlife asked the Commission to delay its licensing decision until fishery management talks concluded. After being notified by the Department that those talks had concluded, on March 15, 2016 the Commission issued Woodland Pulp a new license to continue operating and maintaining the West Branch Project.
The new license requires a number of measures to protect and enhance water quality, aquatic habitat, fisheries resources, terrestrial resources, and recreation opportunities at the project. These include a requirement to operate the developments in store-and-release mode between defined pond elevations, to provide certain minimum flows of water, to develop an Operation Compliance Monitoring Plan, and to provide and enhance fish passage.
A list maintained by the Federal Energy Regulatory Commission shows over 1,000 active hydropower licenses. Many of these licenses will expire in the near future, so relicensing activity for FERC-licensed hydroelectric projects is expected to increase.
Labels:
application,
dam,
FERC,
fish,
fish passage,
fishway,
Forest City,
FPA,
hydropower,
minimum flow,
new license,
relicensing,
St. Croix,
storage,
Vanceboro,
West Branch,
Woodland Pulp
Fish passage for hydrokinetic projects?
Thursday, May 17, 2012
Fishways are often found at dams to allow fish to pass upstream or downstream - but what does fish passage mean for dam-less hydrokinetic projects?
Hydrokinetic energy projects are an innovative way to produce electricity from moving water without building dams. Companies are developing a variety of technologies, many of which use water flowing in a river, ocean or tidal current to spin turbine-generator sets. Most grid-connected hydrokinetic projects are regulated by the Federal Energy Regulatory Commission under its authority over hydropower. This authority comes largely from the Federal Power Act, which requires the Commission to include certain terms in the hydropower project licenses it issues and gives it discretion to impose other conditions. For example, Section 18 of the Federal Power Act provides that the Commission shall require the construction, maintenance, and operation by a licensee of such fishways as may be prescribed by the Secretary of the Interior or the Secretary of Commerce.
Hydrokinetic technologies are still fairly new, so only a handful of projects have received FERC licenses so far. Given that hydrokinetic projects do not include the construction of a new dam, one might not expect fish passage to be an issue, particularly at tidal or ocean sites. Indeed, it appears that for at least some hydrokinetic projects, fish passage may not be an issue. For example, when FERC issued a pilot project license to Verdant Power, LLC for its Roosevelt Island Tidal Energy Project in New York City's East River, the Commission did not include a reservation of the right to require a fishway in the license.
The Commission did include such a fishway reservation in the pilot license it granted to Ocean Renewable Power Company's Cobscook Bay Tidal project in Maine waters. In that case, the Secretary of the Interior cited important and highly valued populations of resident and migratory fish, including endangered Atlantic salmon. Although the Secretary did not prescribe a fishway at the time, Interior requested that the Commission reserve its authority to prescribe fishways under Section 18. When FERC granted ORPC's license, it included an article reserving the authority to require the licensee to construct, operate, and maintain, or to provide for the construction, operation, and maintenance of such fishways as may be prescribed by the Secretary of the Interior.
Although the project licensee later requested an exemption from this article because its project is not a dam and will not create any impoundment, the Commission declined to amend the license. Explaining its reasoning, the Commission pointed to the policy it developed from its traditional hydropower licensing: if the Secretary of the Interior or Commerce so requests, the Commission will include an article reserving the Commission’s authority to require the construction and operation of fishways to preserve the requesting Secretary's future right to to prescribe fishways under Section 18.
What a possible fishway system for a tidal hydrokinetic project remains to be seen, as does whether FERC will impose such a requirement on any operating projects. If the Secretary of the Interior or Commerce prescribes a fishway, FERC can assert its jurisdiction under Section 18 to require fishway installation. Factors that could lead to such a decision may include the particular fish species and resources at each project's site, and a project's actual impacts on those fish.
Hydrokinetic energy projects are an innovative way to produce electricity from moving water without building dams. Companies are developing a variety of technologies, many of which use water flowing in a river, ocean or tidal current to spin turbine-generator sets. Most grid-connected hydrokinetic projects are regulated by the Federal Energy Regulatory Commission under its authority over hydropower. This authority comes largely from the Federal Power Act, which requires the Commission to include certain terms in the hydropower project licenses it issues and gives it discretion to impose other conditions. For example, Section 18 of the Federal Power Act provides that the Commission shall require the construction, maintenance, and operation by a licensee of such fishways as may be prescribed by the Secretary of the Interior or the Secretary of Commerce.
Hydrokinetic technologies are still fairly new, so only a handful of projects have received FERC licenses so far. Given that hydrokinetic projects do not include the construction of a new dam, one might not expect fish passage to be an issue, particularly at tidal or ocean sites. Indeed, it appears that for at least some hydrokinetic projects, fish passage may not be an issue. For example, when FERC issued a pilot project license to Verdant Power, LLC for its Roosevelt Island Tidal Energy Project in New York City's East River, the Commission did not include a reservation of the right to require a fishway in the license.
The Commission did include such a fishway reservation in the pilot license it granted to Ocean Renewable Power Company's Cobscook Bay Tidal project in Maine waters. In that case, the Secretary of the Interior cited important and highly valued populations of resident and migratory fish, including endangered Atlantic salmon. Although the Secretary did not prescribe a fishway at the time, Interior requested that the Commission reserve its authority to prescribe fishways under Section 18. When FERC granted ORPC's license, it included an article reserving the authority to require the licensee to construct, operate, and maintain, or to provide for the construction, operation, and maintenance of such fishways as may be prescribed by the Secretary of the Interior.
Although the project licensee later requested an exemption from this article because its project is not a dam and will not create any impoundment, the Commission declined to amend the license. Explaining its reasoning, the Commission pointed to the policy it developed from its traditional hydropower licensing: if the Secretary of the Interior or Commerce so requests, the Commission will include an article reserving the Commission’s authority to require the construction and operation of fishways to preserve the requesting Secretary's future right to to prescribe fishways under Section 18.
What a possible fishway system for a tidal hydrokinetic project remains to be seen, as does whether FERC will impose such a requirement on any operating projects. If the Secretary of the Interior or Commerce prescribes a fishway, FERC can assert its jurisdiction under Section 18 to require fishway installation. Factors that could lead to such a decision may include the particular fish species and resources at each project's site, and a project's actual impacts on those fish.
Labels:
Cobscook,
Commerce,
dam,
Federal Power Act,
fish,
fish passage,
fishway,
FPA,
hydrokinetic,
Interior,
Maine,
New York,
ORPC,
RITE,
Roosevelt Island,
salmon,
Section 18,
tidal,
Verdant
Plymouth nuclear plant relicensing
Wednesday, February 29, 2012
Two fish - the Atlantic sturgeon and the river herring - have been invoked to threaten the relicensing of a nuclear power plant in Plymouth, Massachusetts.
The Pilgrim Nuclear Power Station, the only operating commercial nuclear power plant in Massachusetts, is a 688 MW boiling water nuclear reactor owned by Entergy. Originally commissioned in 1972 by utility Boston Edison, its original license had the maximum 40-year term allowed under the Atomic Energy Act. That license is due to expire on June 8, 2012.
Entergy applied to the Nuclear Regulatory Commission for a license renewal, seeking the 20 year term allowed for relicensing. That case remains pending. Stakeholders have raised a number of concerns about the plant's relicensing. For example, Pilgrim Station is built around a General Electric Mark I reactor, the same type and design as used in the ill-fated Fukushima I Nuclear Power Plant; like Fukushima, the Plymouth plant is located on the coast. While the Pilgrim plant was designed to handle anticipated natural disasters, some believe the U.S. nuclear industry should be reevaluated in light of the Fukushima incident.
Now, U.S. Congressman Ed Markey of Massachusetts has sent a letter to NRC Chairman Gregory Jaczko requesting that the NRC not re-license Pilgrim Station "until all legal requirements stipulated by the Endangered Species Act (ESA) have been met." Specifically, Congressman Markey notes that two threatened fish species - the Atlantic sturgeon and the river herring - inhabit the waters near the plant but were not considered in a key assessment of threatened or endangered species likely to be affected by relicensure. His letter also notes that the National Marine Fisheries Service has not yet issued a written biological opinion proposing a plan to protect threatened or endangered species, nor has the NMFS issued a written concurrence with the NRC's biological opinion.
These species were known to live in the area in 2007 when the NRC wrote its biological assessment, but were not designated as threatened at that time. NMFS designated the Gulf of Maine distinct population segment of Atlantic Sturgeon as threatened in February 2012, and two species of river herring are currently candidates for listing.
Based on these newly designated statuses, Congressman Markey asked NRC not to re-license the Pilgrim project until after the development of a new biological assessment to include the sturgeon and herring, along with any conditions needed to protect those species.
The Pilgrim Nuclear Power Station, the only operating commercial nuclear power plant in Massachusetts, is a 688 MW boiling water nuclear reactor owned by Entergy. Originally commissioned in 1972 by utility Boston Edison, its original license had the maximum 40-year term allowed under the Atomic Energy Act. That license is due to expire on June 8, 2012.
Entergy applied to the Nuclear Regulatory Commission for a license renewal, seeking the 20 year term allowed for relicensing. That case remains pending. Stakeholders have raised a number of concerns about the plant's relicensing. For example, Pilgrim Station is built around a General Electric Mark I reactor, the same type and design as used in the ill-fated Fukushima I Nuclear Power Plant; like Fukushima, the Plymouth plant is located on the coast. While the Pilgrim plant was designed to handle anticipated natural disasters, some believe the U.S. nuclear industry should be reevaluated in light of the Fukushima incident.
Now, U.S. Congressman Ed Markey of Massachusetts has sent a letter to NRC Chairman Gregory Jaczko requesting that the NRC not re-license Pilgrim Station "until all legal requirements stipulated by the Endangered Species Act (ESA) have been met." Specifically, Congressman Markey notes that two threatened fish species - the Atlantic sturgeon and the river herring - inhabit the waters near the plant but were not considered in a key assessment of threatened or endangered species likely to be affected by relicensure. His letter also notes that the National Marine Fisheries Service has not yet issued a written biological opinion proposing a plan to protect threatened or endangered species, nor has the NMFS issued a written concurrence with the NRC's biological opinion.
These species were known to live in the area in 2007 when the NRC wrote its biological assessment, but were not designated as threatened at that time. NMFS designated the Gulf of Maine distinct population segment of Atlantic Sturgeon as threatened in February 2012, and two species of river herring are currently candidates for listing.
Based on these newly designated statuses, Congressman Markey asked NRC not to re-license the Pilgrim project until after the development of a new biological assessment to include the sturgeon and herring, along with any conditions needed to protect those species.
July 14, 2011 - Maine tidal power navigates the regulatory process
Thursday, July 14, 2011
Can tidal power produce electricity for a Maine island?
Developer TideWorks LLC apparently thinks so. In January 2010, Tideworks filed an application to the Federal Energy Regulatory Commission for a 5 kilowatt project to be sited in the Sasanoa River, off the east side of the island town of Georgetown near Bath. This small project was proposed to provide power to a single-family dwelling on 15-acre Bareneck Island. Tideworks initially applied to FERC for an exemption from licensing. In its application, Tideworks described the project as including a single vertical shaft turbine-style generator housed on a 10' x 20' steel pontoon float held parallel to the east side of Bareneck Island using 40' steel struts. The Bareneck Island house is currently tied to the mainland grid by a 7,200 volt submarine cable, stepped down to 220 volts by a transformer on the island. While Tideworks proposed to keep this underwater cable connection "unless or until the applicant feels the proposed turbine unit will sustain the power needs of the dwelling", its application noted that the power generated by the turbine will be utilized to power the existing residence.
Beyond the technical challenges of building the project, this Maine tidal project must now navigate the regulatory process. Throughout 2010, agencies like NOAA's National Marine Fisheries Service and the U.S. Department of Commerce filed cautious comments with federal regulator FERC. After requesting more information from the developer, FERC accepted Tideworks' exemption application for processing and solicited comments. By September, FERC deemed the application ready for environmental analysis.
As agencies reviewed the project, the U.S. Department of the Interior and Maine Department of Marine Resources used their authority under Section 30(c) of the Federal Power Act to require Tideworks to screen the turbine to prevent fish from being killed. Specifically, the agencies requested a screen with openings of 1 inch or less, and an approach velocity of two feet per second or less at the screen to allow fish to swim away from the intake. These measures are used to protect fishery resources at conventional riverine hydropower projects, and the agencies urged the use of this standard given the unknown effects of the proposed hydrokinetic turbine unit on fishery resources. However, this slow approach velocity was below the minimum operating velocity of the turbine, significantly challenging the project's design. As Tideworks later described the standoff in a filing to FERC, "the project will not be able to generate/operate as a result of these two agency 30(c) conditions (screening/approach velocity)".
Additionally, the developer was encouraged to choose a different regulatory path. Rather than FERC's traditional licensing process, the project appeared to qualify for a more streamlined licensing process for hydrokinetic pilot projects. By March 2011, Tideworks filed an amendment to its application, dropping the request for an exemption from licensing and instead seeking a hydrokinetic pilot license. FERC noted that the same environmental protections, including the problematic screening, would likely apply to a hydrokinetic pilot license as well, and asked the developer to work with key agencies to identify any other project restrictions.
Last week, FERC again asked the developer for more information. In a letter, FERC reminded Tideworks of the commission's hydrokinetic pilot project licensing procedures, including the need to file specific documents including a draft license application and notice of intent.
The hydrokinetic project licensing process is new enough that it is hard to call any one project "typical", but the Tideworks project on the Sasanoa River in Maine illustrates the process of developing an island tidal power resource.
![]() |
| Sunset over skiffs tied up at Five Islands in Georgetown, Maine. |
Developer TideWorks LLC apparently thinks so. In January 2010, Tideworks filed an application to the Federal Energy Regulatory Commission for a 5 kilowatt project to be sited in the Sasanoa River, off the east side of the island town of Georgetown near Bath. This small project was proposed to provide power to a single-family dwelling on 15-acre Bareneck Island. Tideworks initially applied to FERC for an exemption from licensing. In its application, Tideworks described the project as including a single vertical shaft turbine-style generator housed on a 10' x 20' steel pontoon float held parallel to the east side of Bareneck Island using 40' steel struts. The Bareneck Island house is currently tied to the mainland grid by a 7,200 volt submarine cable, stepped down to 220 volts by a transformer on the island. While Tideworks proposed to keep this underwater cable connection "unless or until the applicant feels the proposed turbine unit will sustain the power needs of the dwelling", its application noted that the power generated by the turbine will be utilized to power the existing residence.
Beyond the technical challenges of building the project, this Maine tidal project must now navigate the regulatory process. Throughout 2010, agencies like NOAA's National Marine Fisheries Service and the U.S. Department of Commerce filed cautious comments with federal regulator FERC. After requesting more information from the developer, FERC accepted Tideworks' exemption application for processing and solicited comments. By September, FERC deemed the application ready for environmental analysis.
As agencies reviewed the project, the U.S. Department of the Interior and Maine Department of Marine Resources used their authority under Section 30(c) of the Federal Power Act to require Tideworks to screen the turbine to prevent fish from being killed. Specifically, the agencies requested a screen with openings of 1 inch or less, and an approach velocity of two feet per second or less at the screen to allow fish to swim away from the intake. These measures are used to protect fishery resources at conventional riverine hydropower projects, and the agencies urged the use of this standard given the unknown effects of the proposed hydrokinetic turbine unit on fishery resources. However, this slow approach velocity was below the minimum operating velocity of the turbine, significantly challenging the project's design. As Tideworks later described the standoff in a filing to FERC, "the project will not be able to generate/operate as a result of these two agency 30(c) conditions (screening/approach velocity)".
Additionally, the developer was encouraged to choose a different regulatory path. Rather than FERC's traditional licensing process, the project appeared to qualify for a more streamlined licensing process for hydrokinetic pilot projects. By March 2011, Tideworks filed an amendment to its application, dropping the request for an exemption from licensing and instead seeking a hydrokinetic pilot license. FERC noted that the same environmental protections, including the problematic screening, would likely apply to a hydrokinetic pilot license as well, and asked the developer to work with key agencies to identify any other project restrictions.
Last week, FERC again asked the developer for more information. In a letter, FERC reminded Tideworks of the commission's hydrokinetic pilot project licensing procedures, including the need to file specific documents including a draft license application and notice of intent.
The hydrokinetic project licensing process is new enough that it is hard to call any one project "typical", but the Tideworks project on the Sasanoa River in Maine illustrates the process of developing an island tidal power resource.