Showing posts with label E2Tech. Show all posts
Showing posts with label E2Tech. Show all posts

Maine ocean energy roadmaps

Monday, December 17, 2012

A coalition of Maine trade groups has released a pair of comprehensive permitting and regulatory road maps for developers of offshore wind, wave and tidal projects in Maine. The Maine Composites Alliance, Maine Wind Industry Initiative, and Environmental and Energy Technology Council of Maine (E2Tech) prepared these road maps to help steer potential developers and interested parties through federal, state and local laws and regulations applicable for ocean energy projects.

The documents can be obtained here:
Maine Composites Alliance is an alliance of composite businesses that work together to promote Maine's leadership in the international composites industry.  Maine Wind Industry Initiative is a collaborative created to organize Maine wind industry interests, link opportunities to Maine companies, relate industry needs to the state and federal government and act as a communication hub for Maine-based industrial partners in the wind energy industry. E2Tech seeks to build and expand the State's environmental, energy and clean technology sectors through networking and educational events, business development and sustainable job growth projects, and research, development and commercialization initiatives.

Waters off Maine are considered to be home to significant renewable energy resource potential.  Ocean Renewable Power Company has developed a marine hydrokinetic project off Eastport, and Statoil has proposed an offshore wind project off the Maine coast.  The roadmaps released today are designed to illustrate the path forward for offshore wind or MHK projects.  Developing renewable ocean energy projects requires developers to compile permits and approvals under over a dozen federal and state statutes.  Will the current regulatory structures lead to the development of more ocean energy projects off Maine and other U.S. coasts?

June 25, 2010 - abandoned bridges, and paddling Merrymeeting Bay

Friday, June 25, 2010

Tidal thoughts today, following yesterday's E2Tech forum on ocean energy. E2Tech put on a great event, with speakers Beth Nagusky from state government, Des Fitzgerald of Principle Power, John Ferland of Ocean Renewable Power Company, and Bill Staby of Resolute Marine Energy. Thus all on one panel, we had developers of wind, tidal, and wave energy projects, plus a representative from the government.

Paddling back through time around the site of the former Merrymeeting Bay Bridge.

Gliding over Merrymeeting Bay

The Merrymeeting Bay Bridge was built in 1835 to connect Topsham with East Brunswick. Located near where the Androscoggin River flows into the Bay, the bridge provided a shortcut for commerce. Friends of Merrymeeting Bay have a great history page about the bridge. Bottom line: tolls barely exceeded maintenance costs, and the bridge was repeatedly and badly damaged by floods and ice. In 1896, the bridge was finally wiped out by the spring freshet, and was not rebuilt.

Today, you can still see the granite cribbing that was used to support the 24' wide wooden deck. Here's a shot of the stonework on the south side of Mustard Island:


Bay Bridge remains on the Bath side of Mustard Island

And on the north side:
Bay Bridge remains on the north side of Mustard Island

Right near this point, a very large fish (probably a striper or pike) roiled the water next to my boat, making a 48" diameter boil on the surface. Sturgeon were slapping down all around, and I flushed a great blue heron. There was also a splashy beaver.

Merrymeeting beaver

I'm interested in learning more about how it was decided to build the Bay Bridge back in the 1830s, and what it was like to spend an estimated $1 million in maintenance over 60 years on an asset that just barely broke even in a good year. I'll do some research, but I will be sure to return to the Bay for another firsthand look.

Mustard Island sandbar